Additional floor in Kuwait - Abraq Khitan

Additional floor in Abraq Khitan

Building an additional storey on a house in Abraq Khitan requires a complete survey of the soil and existing foundations. We verify the current structure is designed with sufficient strength to carry the new floor before project approval.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abraq Khitan is a growing residential area with four to five storey houses on medium plots, mixing newer and mid-age buildings. The variety in build years means variance in foundation specs and design methods, so field and lab testing is needed for each project. We obtain the drawings from the authorities and test the concrete and soil at the depth of the original foundations, then assess whether the foundations need deepening or the whole frame needs bracing before starting the new storey.

Abraq Khitan is in Farwaniya governorate and is known for its growing residential zone near commercial hubs.

Foundations in this area typically go down between 1.5 and 3 metres depending on the depth of bearing soil layer.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Abraq Khitan

Call now
Why does structural inspection vary from house to house in Abraq Khitan?

Houses were built in different years under varying specs and design methods. A house built ten years ago may have deeper or stronger foundations than one built recently, so we inspect each case independently.

When do we need to deepen the foundation while adding a floor?

If tests show the existing foundation is too weak to carry the new floor, or if the soil below it is poor or saturated. Then we jack the building and deepen the foundation below the original foundation level.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works