Roof waterproofing in Kuwait - Jahra (Old)

Roof waterproofing in Jahra (Old)

Waterproofing services in Old Jahra focus on older buildings with concrete roofs and traditional tile. We repair existing cracks and fractures before applying a comprehensive new waterproofing system.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Buildings in Old Jahra were constructed decades ago and their concrete roofs have cracked and deteriorated from continuous sun and moisture exposure. Old floor tiles often trap moisture underneath, and previous waterproofing, if present, has lost effectiveness. We carefully remove old tiles and waterproofing, clean the surface of dirt and deposits, fill cracks with flexible cement, then apply fresh waterproofing layers.

Old Jahra sits in Jahra governorate near the famous Al Jahra Fort heritage site.

Older buildings typically need previous waterproofing removed and cracks repaired before a new system is applied.

Back to Roof waterproofing

Waterproofing services we cover - Roof waterproofing

Waterproofing services we cover

Full range of waterproofing systems for flat roofs, pools, tiled surfaces and metal roofs

  • Water and heat insulation

    Combined layer that blocks both moisture ingress and radiant heat transfer

  • Foam roof insulation

    Sprayed polyurethane foam that fills cracks and levels uneven roof surfaces

  • Waterproof coating

    Flexible liquid coating applied directly to concrete or existing surfaces

  • Pool waterproofing

    Internal pool lining system that stops water leaking through walls and base

  • Over-tile waterproofing

    Waterproof layer applied beneath new tiles without removing the old surface

  • Membrane roof waterproofing

    Bituminous or polymer sheets fixed by torch or adhesive to the roof deck

How it works.

  1. First contact

    Call or WhatsApp us to describe the issue and fix a visit

  2. Site inspection

    We visit, measure the area and assess the existing surface condition

  3. Quotation

    We provide a detailed quote covering system type, materials and total cost

  4. Waterproofing works

    Surface prep, system application and reinforcing critical edge details

  5. Test and handover

    Flood test confirms no leaks before formal handover to the client

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Roof waterproofing in Jahra (Old)

Call now
How do you repair cracked roofs in older buildings?

We first assess the cracks to determine depth and direction. Shallow cracks we fill with flexible cement. Deep cracks need to be cut to uniform depth then filled with epoxy. After that we apply new waterproofing to the repaired surface.

Can old tiles be kept after re-waterproofing?

If the tiles are intact and uncracked, they can be reused after cleaning and fresh adhesive. But we usually recommend new tiles for uniform appearance and better protection.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works