Wooden kitchen renovation in Kuwait - Faiha

Wooden kitchen renovation in Faiha

Wooden kitchen renovation in Faiha targets small and medium villas with moisture concentrated around water pipes and cooking appliances. We conduct full structural assessment, replace damaged timber, and apply resilient topcoat.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha holds detached residential villas on reasonably spaced, medium-sized plots, most with older wooden kitchens from the initial building wave in the 1970s. Moisture concentrates around the sink and cooker, where water leaks from original pipes or steam from direct cooking causes damage. At initial inspection we use a moisture meter to map the damage zone, then disassemble cabinets fixed to walls, clean the back surfaces of films and debris, and dry the structure fully before any replacement or refinishing.

Faiha lies in the Capital governorate, a district of villas and quiet gardens set back from main roads.

Kitchen timber in Faiha villas must be moisture-tested before deciding on replacement.

Back to Wooden kitchen renovation

See also: Kitchen renovation in Faiha

What wooden kitchen renovation covers - Wooden kitchen renovation

What wooden kitchen renovation covers

Structural assessment and treatment through to the finished surface coat

  • Doors and drawers

    Sanding, priming and recoating with heat-rated lacquer or paint

  • Swelling and crack repair

    Drying swollen wood, filling cracks and re-levelling panel faces

  • Cabinet interior lining

    Moisture-resistant lining panels fitted inside cabinets and under sinks

  • Hinges and runner replacement

    Rusted hinges and drawer runners replaced with rated closed-bearing hardware

  • Edge and gap sealing

    Panel edges and cabinet-to-wall gaps sealed with heat-rated silicone

  • Cabinet face renewal

    Fully damaged cabinet faces replaced with new sprayed wood or MDF panels

How it works.

  1. Call or whatsApp

    Call or message us with a brief description of the kitchen condition and your location

  2. Site inspection

    We visit to assess damage, identify moisture sources and gauge repair depth

  3. Quotation and agreement

    A detailed quote covering materials, labour and an execution schedule is submitted

  4. Execution and finishing

    Strip, treat, coat and refit in correct sequence with full edge and joint sealing

  5. Handover and check

    All doors and drawers checked with the client for alignment and surface quality

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wooden kitchen renovation in Faiha

Call now
Can kitchen wood damaged by cooker steam be repaired?

If damage is surface-level near steam vents, we sand, apply fungicide, and coat with moisture-resistant finish. If timber is saturated or deeply swollen, we replace those boards.

Must the entire wooden kitchen be removed for renovation?

No, we disassemble cabinets, shelves and counters on site, inspect each piece, replace damaged parts, then reassemble and refinish. Sound cabinets remain in place after finishing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works