Aluminium kitchen renovation in Kuwait - Firdous

Aluminium kitchen renovation in Firdous

Aluminium kitchen renovation in Firdous focuses on relatively older residential units suffering from frame and seal deterioration due to constant heat and humidity exposure. We disassemble damaged sections and replace them with a new frame compatible with existing dimensions.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Firdous is a mid-range residential area with apartment buildings and small villas, mostly built between 2000 and 2010, on close-set plots with tight gaps between buildings. Kitchens there are space-constrained and often sealed by a single door to the corridor or living room. During aluminium frame renovation, we preserve the existing opening and select extrusions thick enough to withstand seasonal expansion and contraction, paying special attention to internal braces that support shelving and cabinet weight.

Firdous is in Farwaniya governorate, a residential district on closely set plots near Firdous Co-op and Sixth Ring Road.

The distributed load on aluminium frames in Firdous kitchens typically ranges from 50 to 80 kilograms, requiring extrusions at least 2 millimetres thick.

Back to Aluminium kitchen renovation

See also: Kitchen renovation in Firdous

What the renovation covers - Aluminium kitchen renovation

What the renovation covers

Addressing every element of an aluminium kitchen from frame to fittings and finishes

  • Profile replacement

    Remove corroded or bent profiles and fit matching replacements precisely

  • Surface repainting

    Sand, clean and repaint aluminium with heat-resistant coating

  • Doors and drawers

    Realign, repair or replace doors and drawers for smooth operation

  • Hinges and fittings

    Swap rusted hinges and rails with corrosion-resistant fittings

  • Joint sealing

    Close every gap between profile and wall to block moisture and fine dust

  • Back panel repair

    Inspect and repair back panels damaged or bubbled by moisture exposure

How it works.

  1. First contact

    Call or WhatsApp to describe your kitchen condition and set a site visit

  2. Site inspection

    We inspect profiles, hinges and surfaces and identify damage causes on site

  3. Quotation

    We provide a detailed quote covering scope, proposed materials and total cost

  4. Execution

    Prepare surfaces, then repaint or replace, seal joints and fit new hardware

  5. Handover check

    We check door movement, drawer action and finish quality before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Aluminium kitchen renovation in Firdous

Call now
Can heavy metal shelves be mounted on the new aluminium frame?

Yes, but only if shelves are supported by internal bracing and fastened at load-bearing points in the frame. We recommend not exceeding 25 kilograms per shelf.

How do you prevent water leakage around the old aluminium frame during renovation?

We use temporary water-resistant plastic or fabric barriers throughout disassembly and reassembly, and apply moisture-resistant silicone around edges before final frame closure.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works