
What sets this area apart
Rehab is a relatively modern residential zone with medium-sized apartments of 100 to 140 square metres in four to six-storey blocks. Buildings here have complete frames to current standards, and units are very clean, so finishing focuses on colours, flooring and electrical and plumbing fixtures without major repairs. This allows us to execute stages swiftly and precisely, handing over a move-in-ready flat.
Rehab is in Farwaniya governorate, a new residential area geared toward young families.
Rehab apartments typically need a finishing period not exceeding 8 to 10 weeks if we start with clear build approvals.

What the instalment finishing covers
Apartment finishing delivered in full under a structured and agreed payment plan

Floors and walls
Marble, porcelain or ceramic laid on floors and wall surfaces

Gypsum board ceilings
Gypsum ceilings hiding AC ducts and housing recessed lighting

Interior painting
Walls and ceilings painted with primer and finish coats to spec

Bathrooms and kitchen
Wet areas waterproofed, tiled, fitted with sanitaryware and shelving

Aluminium and glass
Double-glazed aluminium windows and apartment entrance doors fitted

Electrical and services
Full wiring, distribution board, lighting points and socket outlets
How it works.
First contact
Call or WhatsApp to describe the apartment and book a site visit
Site survey and quote
We visit, measure and define the full scope and payment plan
Contract signing
Scope, phases and instalments are fixed in a clear signed contract
Phased execution
Each phase is completed and inspected before the next payment is released
Final handover
Joint inspection, any corrections made, then final account closed
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Finishing on instalments
Other services in Rehab
Questions about Finishing on instalments in Rehab
Call nowHow many payments are typical for finishing one flat in Rehab?
We typically divide into three to four payments: first before starting, second at 50 per cent progress, third at 80 per cent, final at completion.
Do you undertake repairs of any frame defects before finishing?
We detect frame defects or leaks at start and inform you immediately. If the original contractor is liable, we log it with them. If you bear responsibility, we arrange it separately from the finishing contract.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps