Finishing on instalments in Kuwait - Khitan Al-Jadida

Finishing on instalments in Khitan Al-Jadida

Apartment finishing on instalments in Khitan Al-Jadida serves residents of modern housing units on newly planned plots. We build a payment schedule matching the budget while ensuring steady work progress from start to end.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Khitan Al-Jadida features modern apartment buildings on orderly plots in contemporary layout. Units are newly built and require uniform finishing to building code. Staggered payments let families occupy units in phases, starting with base runs and painting then flooring and doors, ending with full kitchen and bathroom. Each phase is approved by the supervisor before the next begins.

Khitan Al-Jadida lies in Farwaniya governorate and is a new, orderly residential area with modern layout.

We follow the unified project drawings and issue a completion certificate for each finished phase before accepting the next payment.

Back to Finishing on instalments

What the instalment finishing covers - Finishing on instalments

What the instalment finishing covers

Apartment finishing delivered in full under a structured and agreed payment plan

  • Floors and walls

    Marble, porcelain or ceramic laid on floors and wall surfaces

  • Gypsum board ceilings

    Gypsum ceilings hiding AC ducts and housing recessed lighting

  • Interior painting

    Walls and ceilings painted with primer and finish coats to spec

  • Bathrooms and kitchen

    Wet areas waterproofed, tiled, fitted with sanitaryware and shelving

  • Aluminium and glass

    Double-glazed aluminium windows and apartment entrance doors fitted

  • Electrical and services

    Full wiring, distribution board, lighting points and socket outlets

How it works.

  1. First contact

    Call or WhatsApp to describe the apartment and book a site visit

  2. Site survey and quote

    We visit, measure and define the full scope and payment plan

  3. Contract signing

    Scope, phases and instalments are fixed in a clear signed contract

  4. Phased execution

    Each phase is completed and inspected before the next payment is released

  5. Final handover

    Joint inspection, any corrections made, then final account closed

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Finishing on instalments in Khitan Al-Jadida

Call now
How many finishing phases are typical in Khitan Al-Jadida?

Usually three or four phases. Phase one is runs and painting, phase two is flooring and doors, phase three is kitchen and bathroom, phase four is fine finishes.

Is there a final inspection before apartment handover?

Yes. We inspect each item against drawings and specs before handover and issue a list of any remaining work.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works