
What sets this area apart
Zour apartments are in staff housing blocks of four to six storeys, exposed to outdoor temperatures exceeding 50°C and thermal vapours from cooling pipes and stacks. Renovation requires increasing insulation thickness on walls, roofs and windows using polyurethane foam or high-density fibreglass. We replace windows with heat-reflective (low-e) glass, and install air-conditioning units with higher capacity than standard. Exterior roofs need reflective white or silver coating to reduce heat absorption.
Zour sits in Ahmadi governorate, an industrial zone beside the Zour power generation plant.
Zour heat insulation standards require at least 10 centimetres of extra insulation thickness on exterior walls and roofs.

What apartment renovation covers
Full or partial renovation of any apartment, addressing structure, finishes and all services.

Selective demolition and replanning
Remove old finishes and non-structural partitions to suit the new layout.

Plumbing and drainage
Replace or reroute concealed water supply and drainage lines inside the apartment.

Electrical works
Update wiring, distribution board and lighting points to match the new fit-out.

Gypsum ceilings and paint
Install gypsum ceilings hiding ducts, then apply climate-suitable paint systems.

Floors and wall finishes
Lay tile, marble or parquet after waterproofing wet areas first.

Windows, doors and facade
Replace aluminium frames, seal thermal gaps and refresh the apartment's external facade.
How it works.
Call or whatsApp
Contact us to book an on-site inspection of the apartment.
Inspection and assessment
We check services, finishes and document all defects found.
Scope and quotation
A detailed scope of work and clear itemised quote are submitted.
Execution in sequence
Services first, then finishes in the correct order.
Inspection and handover
Joint walkthrough before final handover of the apartment.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Apartment renovation
Other services in Zour
Questions about Apartment renovation in Zour
Call nowAre standard windows enough or do you need special types in Zour?
Standard windows are insufficient. We use low-emissivity (low-e) glass that reflects heat, and typically install double-pane windows to reduce heat gain. This significantly reduces the air-conditioning load.
What air-conditioning capacity is right for a renovated Zour apartment?
After improving insulation, we typically use units rated about 20 to 30 percent higher than standard for normal zones, chosen based on apartment size and the re-insulated wall area.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps