Apartment renovation in Kuwait - Siddiq

Apartment renovation in Siddiq

Apartment renovation in Siddiq targets mid-rise residential buildings built two decades ago, where old piping and wiring need full replacement. We strip the flooring and interior walls, then re-run all services and finishes from scratch.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Siddiq apartments are built with simple concrete frames and repeating unit layouts; interior walls are lightweight and easy to demolish, but the piping and electrical runs inside walls and ceilings are very old and often tangled. During renovation we strip the suspended ceilings and inspect the service routes, and often find undocumented overlaps between drainage, cold-water and electrical runs. Full renovation requires separating these services cleanly and documenting them before the new walls and ceilings go up.

Siddiq is in Hawalli governorate, a dense residential district of mid-rise apartment blocks built in the seventies and eighties.

Most Siddiq units hold three to four bedrooms with total area around 150 to 180 square meters.

Back to Apartment renovation

What apartment renovation covers - Apartment renovation

What apartment renovation covers

Full or partial renovation of any apartment, addressing structure, finishes and all services.

  • Selective demolition and replanning

    Remove old finishes and non-structural partitions to suit the new layout.

  • Plumbing and drainage

    Replace or reroute concealed water supply and drainage lines inside the apartment.

  • Electrical works

    Update wiring, distribution board and lighting points to match the new fit-out.

  • Gypsum ceilings and paint

    Install gypsum ceilings hiding ducts, then apply climate-suitable paint systems.

  • Floors and wall finishes

    Lay tile, marble or parquet after waterproofing wet areas first.

  • Windows, doors and facade

    Replace aluminium frames, seal thermal gaps and refresh the apartment's external facade.

How it works.

  1. Call or whatsApp

    Contact us to book an on-site inspection of the apartment.

  2. Inspection and assessment

    We check services, finishes and document all defects found.

  3. Scope and quotation

    A detailed scope of work and clear itemised quote are submitted.

  4. Execution in sequence

    Services first, then finishes in the correct order.

  5. Inspection and handover

    Joint walkthrough before final handover of the apartment.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Apartment renovation in Siddiq

Call now
Can you separate drainage, water and electrical runs if they are tangled together?

Yes, that is part of a full renovation. We strip the ceilings and inspect all runs, then re-route each service separately and document it before sealing the new walls and ceilings.

How long does it take to renovate a four-bedroom apartment in Siddiq?

It depends on the scope and finishes required, but a full renovation covering structure, services and finishes typically takes eight to ten weeks, including municipal inspection schedules.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works