Water tank installation in Kuwait - Sawaber

Water tank installation in Sawaber

Roof tank installation in Sawaber starts at the concrete frame stage of high-rise residential buildings. We secure the tank on the roof with metal bases and engineering anchors, check level and balance, then run piping and pressure-test the system.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sawaber residential towers reach 12 to 18 storeys on square plots, each requiring a roof tank of 20 to 30 cubic metres capacity. The tank must sit on an isolated concrete base on the roof that withstands water weight and strong winds, and connect to distribution pipes running down interior building columns. We review pump and tank drawings with the engineer before pouring, and test pressure and leaks after final fixing.

Sawaber is in the Capital governorate, a district of closely spaced high-rise residential towers in the city centre.

Roof tanks in Sawaber towers need an isolated concrete base at least 30 centimetres thick to spread the load.

Back to Water tank installation

What the service covers - Water tank installation

What the service covers

Roof tank supply and fit, from frame installation through to pressure testing and commissioning

  • Roof tank installation

    Tank secured to a steel frame sized for the roof slab.

  • Inlet and outlet connections

    PPR supply, draw-off and overflow lines run and fused.

  • Float valve fitting

    Level-control float valve fitted and adjusted to stop overflow.

  • Isolation valves

    Isolation valves on supply and draw-off lines for future maintenance.

  • Pressure test

    System filled and every joint checked before handover.

  • Old tank replacement

    Old tank removed, frame inspected and new tank installed.

How it works.

  1. First contact

    Call or WhatsApp us with photos of the roof and existing tank.

  2. Roof survey

    Technician inspects the roof, frame and existing pipework on site.

  3. Quotation

    Detailed quote covering tank, frame, pipe runs and connections.

  4. Installation

    Frame fixed, tank placed, PPR lines fused and valves fitted.

  5. Test and handover

    Tank filled, joints pressure-checked, float valve set and handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Water tank installation in Sawaber

Call now
How do you secure a roof tank on top of a high tower?

We build an isolated concrete base on the finished roof, hoist the metal tank by crane, and bolt it down with anchor pads and seismic-resistant fasteners. We check level and balance before connecting pipes.

Is the tank tested before the building is handed over?

Yes, we fill the tank, pressure-test all joints and pipes for leaks, and document the results in an official test report.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works