Water tank installation in Kuwait - Bnaid Al-Qar

Water tank installation in Bnaid Al-Qar

Roof tank installation in Bnaid Al-Qar fits on residential blocks backing onto waterfront and old access roads. We account for sea-wind load and salt corrosion on metal fixtures, selecting corrosion-resistant materials.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Bnaid Al-Qar has 4 to 8-storey residential blocks on medium-sized plots with uniformly thick reinforced concrete roofs. Roof tanks here hold 10 to 30 cubic metres serving one or two units each. Proximity to the shoreline means metal bolts and frames face salt-laden winds, so we use galvanized or stainless steel throughout, and rigorously test torque and leaks before handover.

Bnaid Al-Qar sits in Kuwait governorate, near Bnaid Al-Qar coastal bridge and the old airport road.

All mounting bolts in coastal areas must be galvanized steel or stainless steel to resist salt corrosion.

Back to Water tank installation

What the service covers - Water tank installation

What the service covers

Roof tank supply and fit, from frame installation through to pressure testing and commissioning

  • Roof tank installation

    Tank secured to a steel frame sized for the roof slab.

  • Inlet and outlet connections

    PPR supply, draw-off and overflow lines run and fused.

  • Float valve fitting

    Level-control float valve fitted and adjusted to stop overflow.

  • Isolation valves

    Isolation valves on supply and draw-off lines for future maintenance.

  • Pressure test

    System filled and every joint checked before handover.

  • Old tank replacement

    Old tank removed, frame inspected and new tank installed.

How it works.

  1. First contact

    Call or WhatsApp us with photos of the roof and existing tank.

  2. Roof survey

    Technician inspects the roof, frame and existing pipework on site.

  3. Quotation

    Detailed quote covering tank, frame, pipe runs and connections.

  4. Installation

    Frame fixed, tank placed, PPR lines fused and valves fitted.

  5. Test and handover

    Tank filled, joints pressure-checked, float valve set and handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Water tank installation in Bnaid Al-Qar

Call now
Does sea air and salt affect the durability of tank fixing bolts?

Yes, which is why we use high-grade galvanized or stainless steel throughout all fixing points. These materials resist corrosion and rust even in damp coastal environments.

How many fixing points are needed for a 20 cubic metre tank on an apartment block?

Usually 4 to 6 fixing points distributed across the tank base, depending on base shape and roof load rating. We calculate load distribution engineering before any drilling begins.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works