Tank waterproofing & cleaning in Kuwait - Mubarak Al-Kabeer

Tank waterproofing & cleaning in Mubarak Al-Kabeer

Tank cleaning and waterproofing in Mubarak Al-Kabeer covers villa and small apartment block tanks in a densely built residential area. We extract sediment and debris, restore interior linings, and ensure the water supply remains clean and uncontaminated.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mubarak Al-Kabeer tanks vary widely in size and age, from modern roof-top tanks to old ground-level tanks built into house foundations. Older tanks suffer cement lining deterioration and fine cracks that let dirt and algae in. We remove the cover, drain the tank, scrape the damaged lining, inspect the concrete structure inside for hidden seepage, and apply modern waterproofing layers before refilling.

Mubarak Al-Kabeer suburb is in Mubarak Al-Kabeer governorate, a residential area near Messila Beach with villas and apartment buildings.

Most ground tanks in the area are 1.5 to 2 metres deep and require adequate access openings for human entry and hand tools.

Back to Tank waterproofing & cleaning

Tank services we carry out - Tank waterproofing & cleaning

Tank services we carry out

covering interior cleaning, lining, structural repair and full restoration for every tank type

  • Water tank cleaning

    Removing sediment, algae and biofilm then disinfecting the interior

  • Epoxy tank lining

    Food-grade epoxy coat seals concrete and stops contaminants reaching the water

  • Tank waterproofing

    Internal and external waterproof treatment stopping seepage and protecting the slab

  • Underground tank construction

    New reinforced concrete underground tanks built with integral waterproof treatment

  • Water tank restoration

    Crack injection, wall repair and full reinstatement of deteriorated tank structures

  • Fibreglass tank repair

    Patching and reinforcing cracked or degraded fibreglass tank walls and bases

How it works.

  1. Call or whatsApp

    Describe tank type and condition to book a site visit

  2. Inspection

    Internal inspection to assess cracks, scale and required treatment

  3. Quotation

    Detailed quote covering cleaning, lining and any repair works needed

  4. Execution

    Draining, cleaning, repair and waterproofing carried out in correct sequence

  5. Testing and handover

    Leak test and monitoring before reconnecting the tank to the network

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Tank waterproofing & cleaning in Mubarak Al-Kabeer

Call now
What is the difference between epoxy sealant and flexible lining?

Epoxy hardens completely and suits solid, stable concrete tanks. Flexible lining accommodates minor movement and suits tanks subject to slight settlement or vibration. We choose the material based on structural condition and underlying soil.

Can the tank be used for water one day after sealing is complete?

Yes, once the material fully cures, typically 24 hours. We fill partially first and check for leaks, then complete gradually. With fast-set epoxy, limited use may be allowed after 12 hours.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works