Storm-water drainage in Kuwait - Yarmouk

Storm-water drainage in Yarmouk

Storm drainage in Yarmouk must handle dense urban building and medium-sized plots. We install integrated horizontal and vertical drainage networks for quick clearance from roofs, courtyards and paved areas.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Yarmouk has a mix of mid and high-rise residential apartment blocks and shops on plots 30 to 50 metres deep. Flat roofs and open courtyards require drainage networks with 4 to 6 inch diameter pipes and distributed collection points to prevent pooling during seasonal rains. Storm drainage must run separately from sewage and greywater lines, with inspection chambers every 30 metres and underground catch basins feeding to municipality-approved discharge points.

Yarmouk sits in the Capital governorate, a dense residential and commercial district near Yarmouk Sports Club.

Drainage networks require a minimum gradient of 0.5 per cent to ensure water flows without pooling in horizontal pipes.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Yarmouk

Call now
How do you handle rainwater drainage from a tall residential building roof?

We install a vertical 6-inch diameter pipe network running from the roof to an underground catch basin, with inspection points every two floors. The network discharges directly to a municipality-approved outlet or the public drainage system.

Can you combine rainwater drainage with the sewage network?

No, the municipality requires complete separation. Rainwater drainage needs its own independent network with separate pipes and inspection lines, discharging directly to municipal points designated for stormwater only.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works