
Storm-water drainage in Sharq
Storm drainage in Sharq handles tall residential towers, hotels and offices built on narrow coastal plots. We design efficient water collection from rooftops, entrances and parking areas to protect modern structures from seasonal moisture.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Sharq features modern towers closely spaced on narrow plots near the sea, most with multi-level basement parking. Coastal humidity and seasonal rain increase hydrostatic pressure on foundations, so we install perimeter drainage networks with strong pumps and good basement ventilation. We also separate roof drainage from paved floors using independent routes to speed discharge and reduce pump load.
Sharq is in the Capital governorate, a district of modern towers and hotels on tight plots near Sharq Marina and the sea.
High-rise towers in Sharq need backup pumps sized to discharge one hour of rooftop and basement storm water simultaneously.

What the service covers
Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

Storm-drain network design
Drainage drawings with calculated pipe grades, diameters and catchment areas

Rooftop collection channels
Roof gutters and parapet outlets directing water to vertical downpipes

Vertical downpipe runs
uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

Ground-level sumps and gullies
Gully pots and sump chambers with sediment traps at ground level

Connection to storm outlet
Tying the network to the approved discharge point or retention pit

Flow test and commissioning
Water-flow test confirming fall and clear passage before backfilling or plastering
How it works.
First contact
Call or WhatsApp us describing the site, its size and the drainage problem
Site survey
We visit to measure catchment areas, note levels and find existing buried services
Design and quote
We produce a drainage network drawing with a fully itemised price proposal
Installation and testing
Full network is installed, water-tested and confirmed clear before any closure
Handover
Site is handed over with maintenance notes for chambers and channel grates
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Storm-water drainage
Other services in Sharq
Questions about Storm-water drainage in Sharq
Call nowIs rooftop drainage in Sharq's tall towers different from basement-level drainage?
Yes. Roof drainage uses gravity and steep slopes to drains, while basement levels need pumps to lift water to street level or the municipal network.
What role does ventilation play in basement levels during rainy season?
Good ventilation reduces moisture and mold after storm water drains, and protects foundations from water vapor buildup and sustained hydrostatic pressure.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps