Storm-water drainage in Kuwait - Sharq

Storm-water drainage in Sharq

Storm drainage in Sharq handles tall residential towers, hotels and offices built on narrow coastal plots. We design efficient water collection from rooftops, entrances and parking areas to protect modern structures from seasonal moisture.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sharq features modern towers closely spaced on narrow plots near the sea, most with multi-level basement parking. Coastal humidity and seasonal rain increase hydrostatic pressure on foundations, so we install perimeter drainage networks with strong pumps and good basement ventilation. We also separate roof drainage from paved floors using independent routes to speed discharge and reduce pump load.

Sharq is in the Capital governorate, a district of modern towers and hotels on tight plots near Sharq Marina and the sea.

High-rise towers in Sharq need backup pumps sized to discharge one hour of rooftop and basement storm water simultaneously.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Sharq

Call now
Is rooftop drainage in Sharq's tall towers different from basement-level drainage?

Yes. Roof drainage uses gravity and steep slopes to drains, while basement levels need pumps to lift water to street level or the municipal network.

What role does ventilation play in basement levels during rainy season?

Good ventilation reduces moisture and mold after storm water drains, and protects foundations from water vapor buildup and sustained hydrostatic pressure.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works