Storm-water drainage in Kuwait - Sabah Al-Nasser

Storm-water drainage in Sabah Al-Nasser

Storm drainage in Sabah Al-Nasser serves mid-rise apartment blocks and family villas spread across regular, planned plots. We design routes and collection points to move water quickly and efficiently to tanks or the municipal system. Each residential unit gets its own approved and separate drainage right.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sabah Al-Nasser has a regular layout with four to six storey apartment blocks and family villas between them. Plots here are fairly uniform in size and shape, making unified drainage design easier. But residential density means main drainage lines serve several adjoining buildings, so we plan for periodic inspection and network flushing. Proximity to the Sixth Ring Road also affects seasonal groundwater levels.

Sabah Al-Nasser lies in Farwaniya governorate near the Sixth Ring Road, a planned residential development area.

We install inspection chambers on main drainage lines every thirty metres for maintenance and cleaning access.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Sabah Al-Nasser

Call now
Is apartment block drainage separate from villa drainage?

Yes, each building has its own separate network leading to its own discharge point or tank. This prevents peak bottlenecks and allows independent maintenance for each unit.

How do you handle drainage when groundwater levels are high?

We raise the main line depth or use backflow and flood prevention pipes. We monitor groundwater levels before design and select the right solution for each site.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works