Storm-water drainage in Kuwait - Khalidiya

Storm-water drainage in Khalidiya

Storm drainage in Khalidiya requires comprehensive networks because the area has tall residential buildings and large open courtyards. We design and install multi-level drainage systems that collect water from roofs and paved areas and clear it quickly.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Khalidiya has modern apartment buildings 10 to 15 storeys tall on plots around 40 metres deep, with hotels and large open parking areas. Draining rain from these broad surfaces needs 6-inch or larger diameter pipes and multiple collection points across the courtyard and roof. Each collection point connects to an underground basin sized to the drainage area, then to the public network. The network must be tested with water before handover and pipes checked for blockages and leaks.

Khalidiya sits in the Capital governorate, near Khalidiya Park and Khalidiya Co-op Society.

Inspection points must be provided every 30 metres along any horizontal run of storm drainage.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Khalidiya

Call now
What size underground catch basin do you use for a large open courtyard?

The size depends on courtyard area and expected rainfall intensity. For a 500 square-metre courtyard, we install a basin with capacity of at least 10 to 15 cubic metres, with continuous drainage to the public network so it does not overflow.

Do you test the drainage network before final handover?

Yes, we fill the network with water and monitor pressure and flow for hours to confirm there are no leaks or blockages. We record results and hand over the system clear and ready to operate.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works