Storm drainage in Kabd handles roof and yard runoff from equestrian facilities, arid landscape and small farms. We design routes protected against subsidence and settlement on soft, shifting sandy soil.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Kabd is an arid desert zone with scattered villas, equestrian facilities and small agricultural plots on very fine, mobile sandy soil. Surface runoff is sparse but intense during seasonal rains. Drainage here requires reinforced pipes and very strong subgrade protection because soil can shift and cause settlement. We choose reinforced plastic or reinforced concrete pipes, and add extra protection around each inspection chamber.

Kabd sits in Jahra governorate, an arid desert zone known for camel racing track, horse breeding and rural pursuits.

Drainage pipes in Kabd require a compacted gravel protection layer at least 40 centimetres deep to prevent settlement on soft soil.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Kabd

Call now
How do you protect pipes from subsidence in soft sandy soil?

We use a strong gravel base layer compacted over 40 centimetres, and select high-rigidity reinforced pipes. We assess soil conditions with a geotechnical study before design.

Is seasonal rainfall runoff very intense and could stress the network?

Yes, despite infrequent rainfall. When it falls, runoff is very intense because desert soil does not absorb water quickly. We size pipes and trenches with slightly larger diameter and gradient than standard.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works