Storm-water drainage in Kuwait - Anjafa

Storm-water drainage in Anjafa

Storm drainage networks in Anjafa serve mid-rise apartments and villas on regular plots. We install collection pipes from roofs and courtyards, terminating at transfer stations or approved outlets per the building permit.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa is a regular residential district with five to seven-storey apartments and single villas on standard plots. Buildings are evenly spaced and main streets are wide, making it easier to run drainage pipes under roads. The stormwater network collects from each plot separately and feeds into main lines under the main street. We review electrical and civil designs with the site engineer before work to avoid clashing drainage pipes with cables and foundations.

Anjafa is in Hawalli governorate, a regularly planned residential district with standard plots and wide streets.

We maintain a minimum 1.5 metre horizontal separation between sanitary and stormwater pipes per code.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Anjafa

Call now
How do you separate stormwater and sanitary lines under the same street?

We run stormwater pipes on one street side and sanitary lines on the other, with a minimum 1.5 metre horizontal gap. We mark clear routes on drawings and flag them on site before excavation.

Does stormwater drainage from standard villas on a regular plot require special inspection?

Yes, we test pipe slopes, screens and catch basins before concrete and cover. We document results in the project file for later maintenance and inspection.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works