Storm-water drainage in Kuwait - Abu Fatira

Storm-water drainage in Abu Fatira

Storm drainage in Abu Fatira must be carefully designed because the area is residential villas on relatively large plots. We design surface and subsurface drains to handle seasonal rain and clear it fast before it pools around foundations.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abu Fatira consists of detached villas on relatively spacious plots ranging from 600 to 1000 square metres, with landscaping and gardens around each house. The main challenge here is mixed sandy and clay soil that traps water easily, so we install drainage pipes at calculated slope and gravel trenches to clear water from foundations and walkways. We map drain routes before excavation and ensure they connect to the municipality's main channels in the street.

Abu Fatira is in Mubarak Al-Kabeer governorate, a district of detached residential villas on spacious plots with sandy-clay soil.

We install drainage pipes at a slope of at least 1 in 100 to ensure water flows correctly.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Abu Fatira

Call now
How do you handle storm drainage on a large plot with a garden around the villa?

We organize water runoff from the roof, walkways and garden with gravel trenches and buried pipes that channel water to a soakage tank or the municipality's channel depending on the site's groundwater level.

Does sandy-clay soil affect the drainage network design?

Very much so. This soil type absorbs water slowly, so we deepen the trenches and increase pipe spacing, and sometimes use layered gravel backfill to speed up drainage.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works