Sewage contractor in Kuwait - Sharq

Sewage contractor in Sharq

Sewer networks in Sharq serve tall buildings and dense residential blocks on limited plots near Hamad Tower and the marina, requiring clear vertical rises from collection points to lift stations when required.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sharq features tall residential buildings reaching ten storeys or more with ground-floor shops on tight, multi-access plots. Drainage from upper floors requires pipe diameters large enough to handle rising wastewater volume; since natural gradient often falls short due to the street level being lower than the building basement, we install lift stations with pumps to push water to the public network. Each lift station needs an inspection opening and ventilation to prevent pooling and odour.

Sharq is in the Capital governorate, a district of tall buildings, hotels and office towers around Hamad Tower and Sharq Marina.

Lift stations in dense areas need periodic cleaning every two to three months to prevent pump blockage from sediment accumulation.

Back to Sewage contractor

What the service covers - Sewage contractor

What the service covers

Sewer network installation from internal drain points through buried runs to the public network.

  • Sewer network installation

    Buried uPVC pipe runs at correct gradient from building to public network.

  • Inspection chambers

    Concrete or precast chambers at every junction and change of direction.

  • Excavation and backfill

    Trench digging, sand bedding and compacted backfill after testing.

  • Public network tie-in

    Sealed and approved entry into the nearest municipal inspection manhole.

  • Flow and pressure test

    Full network flow test confirming gradient and zero leakage before closing.

  • Surface reinstatement

    Paving or tiling restoration over excavated areas after work is complete.

How it works.

  1. Contact and survey

    Call or WhatsApp to schedule a site survey visit.

  2. Network design

    Plot the pipe route, set gradients and confirm chamber locations.

  3. Excavation and pipe laying

    Dig trenches, lay sand bed, run uPVC pipes and build chambers.

  4. Testing and tie-in

    Run flow test then make the sealed tie-in to the municipal manhole.

  5. Backfill and reinstatement

    Layer and compact backfill then restore all surface finishes.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Sewage contractor in Sharq

Call now
Can wastewater be pushed without a lift station in a very tall building?

No, if the tie-in point with the public network sits lower than the basement level, a lift station is required. Natural gradient alone is insufficient; the station ensures safe, stable discharge.

What purpose do the inspection and ventilation openings serve at the discharge point?

The inspection opening allows pipe cleaning and blockage removal; ventilation releases trapped air and odours to prevent gas buildup and excess pressure on the network.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works