Sewage contractor in Kuwait - Khitan

Sewage contractor in Khitan

Sewer network in Khitan runs from service spaces in closely built residential buildings through tight, space-limited trenches to the public network. We maintain required separation from water pipes and test watertightness before burial.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Khitan is marked by closely packed apartment buildings on narrow plots, so pipe trenching happens in confined spaces between existing structures. The sewer network starts from internal pipes in each residential unit, collects at designated points, and slopes toward the public network connection. We carefully review building designs, property boundaries, and existing lines, and use small excavators or hand digging where necessary. We also separate sewage pipes from adjoining residential units that may run under shared passages.

Khitan is in Farwaniya governorate, a dense residential area of tightly packed apartment buildings near Khitan Co-op.

Sewer pipes in dense urban areas typically range from 100 mm to 200 mm diameter depending on the collection volume.

Back to Sewage contractor

What the service covers - Sewage contractor

What the service covers

Sewer network installation from internal drain points through buried runs to the public network.

  • Sewer network installation

    Buried uPVC pipe runs at correct gradient from building to public network.

  • Inspection chambers

    Concrete or precast chambers at every junction and change of direction.

  • Excavation and backfill

    Trench digging, sand bedding and compacted backfill after testing.

  • Public network tie-in

    Sealed and approved entry into the nearest municipal inspection manhole.

  • Flow and pressure test

    Full network flow test confirming gradient and zero leakage before closing.

  • Surface reinstatement

    Paving or tiling restoration over excavated areas after work is complete.

How it works.

  1. Contact and survey

    Call or WhatsApp to schedule a site survey visit.

  2. Network design

    Plot the pipe route, set gradients and confirm chamber locations.

  3. Excavation and pipe laying

    Dig trenches, lay sand bed, run uPVC pipes and build chambers.

  4. Testing and tie-in

    Run flow test then make the sealed tie-in to the municipal manhole.

  5. Backfill and reinstatement

    Layer and compact backfill then restore all surface finishes.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Sewage contractor in Khitan

Call now
How do you excavate in the tight spaces between buildings?

We use small-arm excavators and manual digging in sensitive areas, with strict protection of foundations and existing services. Each excavation and burial step is supervised directly by the site engineer.

Can sewage from multiple residential units be separated under the same shared passage?

Yes, but we use separate pipes with adequate diameters for each unit or unit group, with inspection chambers at connection points, to facilitate future maintenance and cleaning.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works