Sewage contractor in Kuwait - Fintas

Sewage contractor in Fintas

Sewage services in Fintas cover villas and residential apartment blocks spread across medium-sized plots near the co-op and beach. We lay buried networks from interior collection points through sloped pipe runs to the public network.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Fintas has residential apartment buildings and villas on medium-sized plots ranging from three to five storeys, plus some detached houses. The groundwater table in the area is relatively high, which requires careful study of foundation depths and drainage before laying the pipe network plan. We calculate the required slope for each network section based on the collection point level and the public network connection point, and use corrosion-resistant pipe materials suitable for salt-saturated sandy soil.

Fintas lies in Ahmadi governorate, a residential area close to Fintas Co-op and the sandy beach.

We check the groundwater level before fixing the depth of the building's main sewer trench.

Back to Sewage contractor

What the service covers - Sewage contractor

What the service covers

Sewer network installation from internal drain points through buried runs to the public network.

  • Sewer network installation

    Buried uPVC pipe runs at correct gradient from building to public network.

  • Inspection chambers

    Concrete or precast chambers at every junction and change of direction.

  • Excavation and backfill

    Trench digging, sand bedding and compacted backfill after testing.

  • Public network tie-in

    Sealed and approved entry into the nearest municipal inspection manhole.

  • Flow and pressure test

    Full network flow test confirming gradient and zero leakage before closing.

  • Surface reinstatement

    Paving or tiling restoration over excavated areas after work is complete.

How it works.

  1. Contact and survey

    Call or WhatsApp to schedule a site survey visit.

  2. Network design

    Plot the pipe route, set gradients and confirm chamber locations.

  3. Excavation and pipe laying

    Dig trenches, lay sand bed, run uPVC pipes and build chambers.

  4. Testing and tie-in

    Run flow test then make the sealed tie-in to the municipal manhole.

  5. Backfill and reinstatement

    Layer and compact backfill then restore all surface finishes.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Sewage contractor in Fintas

Call now
How do you handle the high groundwater table in Fintas?

We conduct a geotechnical survey before design, and either raise the pipes slightly above the water table or apply additional drainage around the trench to protect the network from seepage.

Do you handle sewage pipes for both detached houses and apartment blocks?

Yes, each type has different flow and slope calculations. Detached houses need smaller lines, and apartment blocks require larger diameters and intermediate inspection points along the network.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works