Municipal sewer connection in Kuwait - Sabhan Industrial

Municipal sewer connection in Sabhan Industrial

Municipal sewer connection in Sabhan Industrial serves warehouses and small to medium factories on large plots. We run the drain from the facility to the public manhole, test the line, and hand over completion.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sabhan Industrial consists of large plots for warehouses, workshops and light factories, mostly simple single or two-storey structures. Floors are typically solid concrete for truck and equipment loading, which means deep excavation to reach the sewer line beneath. The municipality network is available but the large plot sizes need longer drain runs, and we maintain proper gradient along the entire route.

Sabhan Industrial sits in Mubarak Al-Kabeer governorate, a district dedicated to warehouses and light manufacturing.

Sewer lines in industrial areas must run beneath thick concrete floors that require precise cutting and excavation.

Back to Municipal sewer connection

What the service covers - Municipal sewer connection

What the service covers

We run the private drain line out to the public manhole, test and reinstate

  • Connection survey

    Locating the public manhole and planning the pipe route

  • Trench excavation

    Cutting the trench to adequate depth without disturbing nearby foundations

  • uPVC pipe run

    Laying uPVC drain pipe on a sand bed with continuous fall to the network

  • Intermediate chamber

    Setting an inspection chamber at bends and at required inspection intervals

  • Public manhole entry

    Coring the manhole wall and sealing the connection with hydraulic mortar

  • Flow test and backfill

    Running a water flow test before backfilling the trench in compacted layers

How it works.

  1. First contact

    Call or WhatsApp us describing the building location and connection need

  2. Site survey

    Our engineer visits to locate the public manhole and plan the route

  3. Quotation

    A detailed quote covering excavation, pipes, chambers and reinstatement is issued

  4. Works and testing

    We excavate, lay pipe, connect to manhole and flow-test before backfilling

  5. Backfill and handover

    Trench is compacted in layers, surface reinstated and site handed over clean

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Municipal sewer connection in Sabhan Industrial

Call now
How do you handle thick concrete floors when connecting the drain?

We locate the line using ground-penetrating radar, cut the concrete precisely with a concrete saw, clean the excavation, run the pipes, then pour and level the concrete back.

Can the drain line run under the loading area of the warehouse?

We advise against it because continuous truck traffic can stress the pipes. We prefer to route the line along the site perimeter away from equipment movement.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works