Municipal sewer connection in Kuwait - Qibla

Municipal sewer connection in Qibla

Municipal sewer connection in Qibla addresses mixed-use buildings and large commercial shops on medium plots near Gulf Road. We test the lines and certify the connection between the private network and the public system with municipality approval.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Qibla has large commercial shops and mixed residential buildings at mid-rise heights on scattered plots along Gulf Road. The large shops facing the main street generate heavy sewage flows, requiring an intermediate inspection chamber before connection to the public network to regulate water flow. We review plans with the municipality inspector and test the entire line with water and pressure before handover.

Qibla sits in the Capital governorate on Gulf Road, near Seif Palace and numerous financial and commercial institutions.

Main drainage pipes from large commercial shops must be at least one hundred fifty millimetres in diameter when connected to the public network.

Back to Municipal sewer connection

What the service covers - Municipal sewer connection

What the service covers

We run the private drain line out to the public manhole, test and reinstate

  • Connection survey

    Locating the public manhole and planning the pipe route

  • Trench excavation

    Cutting the trench to adequate depth without disturbing nearby foundations

  • uPVC pipe run

    Laying uPVC drain pipe on a sand bed with continuous fall to the network

  • Intermediate chamber

    Setting an inspection chamber at bends and at required inspection intervals

  • Public manhole entry

    Coring the manhole wall and sealing the connection with hydraulic mortar

  • Flow test and backfill

    Running a water flow test before backfilling the trench in compacted layers

How it works.

  1. First contact

    Call or WhatsApp us describing the building location and connection need

  2. Site survey

    Our engineer visits to locate the public manhole and plan the route

  3. Quotation

    A detailed quote covering excavation, pipes, chambers and reinstatement is issued

  4. Works and testing

    We excavate, lay pipe, connect to manhole and flow-test before backfilling

  5. Backfill and handover

    Trench is compacted in layers, surface reinstated and site handed over clean

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Municipal sewer connection in Qibla

Call now
Do we need an intermediate inspection chamber between the commercial shop and the public network?

Yes, if the distance exceeds fifty metres or if the line changes direction. The intermediate chamber provides a cleaning and inspection point in case of blockage and helps regulate water flow from the shop to the public network.

How do we test the drainage line before it is approved by the municipality?

We fill the line with water and monitor pressure for thirty minutes to ensure no leakage. Then we inspect it with a television camera and document no cracks or sharp bends, and finally flush it with pressurised water before final handover to the municipality inspector.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works