Municipal sewer connection in Kuwait - Fahad Al-Ahmad

Municipal sewer connection in Fahad Al-Ahmad

Municipal sewer connection in Fahad Al-Ahmad requires running a line from the building's underground pit to the public junction chamber. We test the pipes and joints before backfilling and reinstating the surface.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Family homes on medium-sized plots in a developing residential area, mostly villas and newer apartment blocks. The main street public network requires a run of 40 to 80 metres depending on the main junction location. Each house needs a survey of its existing pit, area and drain depth before permit submission, and we check that pipes do not cross buried electrical or water lines.

Fahad Al-Ahmad sits in Ahmadi governorate, a residential family area of villas and apartment blocks on organized plots.

The typical run from a building pit to the public junction in the suburb is 50 to 75 metres.

Back to Municipal sewer connection

What the service covers - Municipal sewer connection

What the service covers

We run the private drain line out to the public manhole, test and reinstate

  • Connection survey

    Locating the public manhole and planning the pipe route

  • Trench excavation

    Cutting the trench to adequate depth without disturbing nearby foundations

  • uPVC pipe run

    Laying uPVC drain pipe on a sand bed with continuous fall to the network

  • Intermediate chamber

    Setting an inspection chamber at bends and at required inspection intervals

  • Public manhole entry

    Coring the manhole wall and sealing the connection with hydraulic mortar

  • Flow test and backfill

    Running a water flow test before backfilling the trench in compacted layers

How it works.

  1. First contact

    Call or WhatsApp us describing the building location and connection need

  2. Site survey

    Our engineer visits to locate the public manhole and plan the route

  3. Quotation

    A detailed quote covering excavation, pipes, chambers and reinstatement is issued

  4. Works and testing

    We excavate, lay pipe, connect to manhole and flow-test before backfilling

  5. Backfill and handover

    Trench is compacted in layers, surface reinstated and site handed over clean

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Municipal sewer connection in Fahad Al-Ahmad

Call now
How do we ensure we do not cut electrical or water lines while digging the connection

We request service maps from the municipality and water and electricity providers before digging. We use metal detectors and hand-dig in sensitive areas.

Does the installation require the building to stop using sewerage during the connection?

Yes, but the downtime is usually just two to three hours. We pressure-test the new line with water before connecting the old pipes, then flush and finish.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works