Municipal sewer connection in Kuwait - Daiya

Municipal sewer connection in Daiya

Municipal sewer connection in Daiya involves trenching from the building to the public network access point, with pressure testing and full dewatering. We map the line and hand over completed plans with the project.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya is a residential district in the Capital with large villas and apartment blocks on fairly spacious plots. The public sewer network runs beneath main roads, but the area is marked by very high groundwater flow in certain seasons. This means excavation often encounters large volumes of groundwater, and we install sump boxes with continuous pumping during work. Drain pipes must also be completely sealed to prevent groundwater ingress.

Daiya sits in the Capital governorate near the British School of Kuwait and Daiya Park.

In areas with high groundwater, drain pipes must be surrounded by fine sand then clay soil to prevent groundwater seepage.

Back to Municipal sewer connection

What the service covers - Municipal sewer connection

What the service covers

We run the private drain line out to the public manhole, test and reinstate

  • Connection survey

    Locating the public manhole and planning the pipe route

  • Trench excavation

    Cutting the trench to adequate depth without disturbing nearby foundations

  • uPVC pipe run

    Laying uPVC drain pipe on a sand bed with continuous fall to the network

  • Intermediate chamber

    Setting an inspection chamber at bends and at required inspection intervals

  • Public manhole entry

    Coring the manhole wall and sealing the connection with hydraulic mortar

  • Flow test and backfill

    Running a water flow test before backfilling the trench in compacted layers

How it works.

  1. First contact

    Call or WhatsApp us describing the building location and connection need

  2. Site survey

    Our engineer visits to locate the public manhole and plan the route

  3. Quotation

    A detailed quote covering excavation, pipes, chambers and reinstatement is issued

  4. Works and testing

    We excavate, lay pipe, connect to manhole and flow-test before backfilling

  5. Backfill and handover

    Trench is compacted in layers, surface reinstated and site handed over clean

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Municipal sewer connection in Daiya

Call now
How do we handle high groundwater when trenching for the drain line in Daiya?

We install sump boxes with continuous pumping to lower the water table during excavation and laying. We test the line under high water pressure to ensure groundwater does not seep into it.

Does the sewer connection method differ in Daiya from other residential areas?

Yes, due to high groundwater. We use pressure-resistant and better-insulated pipes, and increase inspection boxes to monitor any potential leaks easily.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works