First-fix plumbing, new houses in Kuwait - Zour

First-fix plumbing, new houses in Zour

First-fix plumbing at Zour serves power generation plants and heavy installations with extremely high water loads. We run supply, cooling and drain lines in large diameters to match process specifications before frame closure.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Power generation plants at Zour require massive water networks for cooling and thermal processes, with large structural spans permitting pipes up to 30 inches or larger in diameter. Cooling water lines must be completely separated from potable and sanitary drainage, with thermal insulation and vapour barriers on lines exposed to condensation. Each network has independent pumps, valves and measurement devices that must be documented before operation starts.

Zour sits in Ahmadi governorate, home to the Zour power generation and thermal energy plant.

We completely separate industrial cooling networks from potable and sanitary networks using physical isolation and independent isolation valves.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Zour

Call now
What size are supply pipes in power generation plants?

Often over 20 inches, depending on cooling load. We select galvanized or fibre-reinforced steel pipes to handle high pressure and temperature.

Is thermal insulation needed on pipes at a power plant?

Yes, especially on hot water and cooling lines to minimize heat loss and condensation. We apply thermal insulation and a protective vapour layer before operation begins.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works