First-fix plumbing, new houses in Kuwait - Qortuba

First-fix plumbing, new houses in Qortuba

First-fix plumbing in Qortuba serves upscale, modern residential villas on spacious plots. We focus on precise water and drain line placement before walls close to avoid costly repairs later.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Qortuba is an upscale residential area specialising in modern family villas on very large plots often exceeding 1500 square metres. Each villa needs a complex plumbing network covering multiple bathrooms, annexes, gardens, fountains and pools with separate pipes and meters for each consumption point. Design requires a geological survey to determine drainage routes based on soil slope and distance from the public network.

Qortuba is in the Capital governorate, an upscale residential district known for its high-end, modern villas.

Large villas in Qortuba require water pressure pumps to distribute water efficiently across all floors and annexes.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Qortuba

Call now
How do we design a drainage system for a villa with a swimming pool and large garden?

We separate drainage into three networks: interior building drainage, a dedicated pool perimeter drainage with a sump pump, and separate rainwater drainage from the garden area.

Do we need separate water tanks for a single villa?

Yes, large villas typically need separate overhead and ground tanks to ensure continuous water flow and adequate pressure for bathrooms, kitchen and garden systems.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works