Rooftop annex in Kuwait - Qasr

Rooftop annex in Qasr

Rooftop annexes in Qasr are constructed on sturdy slabs engineered for additional load. We test the slab and structural elements, then design and execute the annex in full under a single contract covering design, building and final handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Residential buildings in Qasr have moderate heights and relatively thick upper slabs. Building a rooftop annex requires careful inspection of slab thickness, columns and even weight distribution for new loads. We design the annex with a foundation that spreads weight evenly and avoids weak points in the original slab. We install separate drainage pipes and use robust moisture barriers around all outer walls and the annex floor.

Qasr sits in Jahra governorate, a residential area predominantly composed of medium-rise apartment buildings.

We verify even load distribution across the upper slab before any annex structures are fixed.

Back to Rooftop annex

What the work covers - Rooftop annex

What the work covers

Design, structural check, build and full handover handled under one contract.

  • Rooftop annex design

    Approved drawings suited to the existing floor and municipality requirements.

  • Carrying slab check

    Engineering assessment of the existing slab before any work begins.

  • Rooftop structural shell

    Columns, beams and slab poured to the correct structural specification.

  • Slab junction waterproofing

    Full waterproofing seal at the old roof and new annex floor junction.

  • Staircase access

    Internal or external staircase connecting the annex to lower floors.

  • Full finishing

    Tiling, gypsum, aluminium, glass, paint, electrical and plumbing works.

How it works.

  1. Call or whatsApp

    Tell us the property location and annex requirements to begin.

  2. Site visit and check

    We visit, assess the carrying slab and check site access conditions.

  3. Design and permit

    Drawings prepared and municipality permit obtained before work starts.

  4. Construction

    Dowel fixing, column pour, block walls and finishes per approved drawings.

  5. Inspection and handover

    Waterproofing, drainage and electrical verified before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop annex in Qasr

Call now
Does a rooftop annex affect the units below in an apartment building?

If the annex is properly designed with even load distribution, there is no negative impact on units below. We carefully select supporting column locations.

How long does the entire design, build and handover process take?

It depends on annex size and original slab condition. After inspection and design approval, construction typically takes two to four months.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works