Rooftop annex in Kuwait - Mansouriya

Rooftop annex in Mansouriya

Rooftop annexes in Mansouriya expand units on existing concrete slabs. We carefully inspect the original structure and foundation before design and execution.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mansouriya has mid-rise apartment buildings on regular plots near the Fourth Ring Road. Concrete slabs there are typically built to current standards, but adding a roof annex requires checking live and dead loads and confirming columns and foundations are adequate. We conduct theoretical load testing and structural survey before approval, then design the annex to keep added load as low as possible. Finishing includes full thermal and waterproof insulation.

Mansouriya is in Kuwait governorate, a residential area on the Fourth Ring Road with nearby commercial services.

We verify the allowable load rating for the slab and columns before designing the annex.

Back to Rooftop annex

What the work covers - Rooftop annex

What the work covers

Design, structural check, build and full handover handled under one contract.

  • Rooftop annex design

    Approved drawings suited to the existing floor and municipality requirements.

  • Carrying slab check

    Engineering assessment of the existing slab before any work begins.

  • Rooftop structural shell

    Columns, beams and slab poured to the correct structural specification.

  • Slab junction waterproofing

    Full waterproofing seal at the old roof and new annex floor junction.

  • Staircase access

    Internal or external staircase connecting the annex to lower floors.

  • Full finishing

    Tiling, gypsum, aluminium, glass, paint, electrical and plumbing works.

How it works.

  1. Call or whatsApp

    Tell us the property location and annex requirements to begin.

  2. Site visit and check

    We visit, assess the carrying slab and check site access conditions.

  3. Design and permit

    Drawings prepared and municipality permit obtained before work starts.

  4. Construction

    Dowel fixing, column pour, block walls and finishes per approved drawings.

  5. Inspection and handover

    Waterproofing, drainage and electrical verified before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop annex in Mansouriya

Call now
Do all roof annexes require structural reinforcement?

Not necessarily. If the slab and columns can support the additional load per the engineering assessment, we build the annex directly without reinforcement.

What is the typical construction time for a roof annex in Mansouriya?

It depends on the annex size and materials, but a small annex typically takes six to eight weeks from inspection to handover.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works