Outdoor majlis construction in Kuwait - Abraq Khitan

Outdoor majlis construction in Abraq Khitan

Outdoor majlis construction in Abraq Khitan demands tight thermal and moisture insulation design on medium-sized plots. We deliver fully insulated structures with separate utility runs planned from day one.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abraq Khitan is a growing residential district with medium-sized plots, and outdoor majlis designs here vary between square and rectangular forms based on plot orientation and prevailing winds. The majlis frame uses reinforced concrete with columns, beams and multi-layer insulated roofing, plus hollow concrete block walls that provide natural thermal insulation. We route utility runs so they do not cross the main building's foundations, and provide a narrow inspection chamber for maintenance. Flooring is usually stone tile or marble with a gentle slope for drainage.

Abraq Khitan sits in Farwaniya governorate as a separate residential zone distinct from old Khitan.

Abraq Khitan plots typically extend 25 to 30 metres in depth, allowing an outdoor majlis of 4 to 5 metres width without breaching setbacks.

Back to Outdoor majlis construction

What the service covers - Outdoor majlis construction

What the service covers

Design through handover, structure, insulation, finishing and utilities for your outdoor majlis

  • Outdoor majlis design

    Architectural and structural drawings suited to your plot and available space

  • Structural shell

    Reinforced concrete columns, beams and slab ready for finishing works

  • Block walls and full finish

    Block walls, floor and wall tiling, gypsum, paint, aluminium and glass

  • Roof thermal insulation

    Insulation layer above the slab to reduce heat in Kuwait's long summers

  • Plumbing and drainage

    Water supply lines, drainage and a service sink fitted inside the majlis

  • Electrical works

    Wiring, lighting, AC sleeve openings and exterior lighting points

How it works.

  1. First contact

    Call or WhatsApp us with your site location and majlis idea

  2. Site visit and design

    We visit the site and prepare structural and architectural drawings

  3. Quotation and contract

    We submit a detailed quote and sign the works contract

  4. Build and finish

    Structure, insulation, finishing, electrical and plumbing are completed in sequence

  5. Handover

    We hand over the completed majlis with a walkthrough inspection

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Outdoor majlis construction in Abraq Khitan

Call now
Do you consider wind direction and sun exposure when designing the majlis?

Yes, it is essential. We orient ventilation openings and roof direction to minimize heat gain from western sun exposure and enable natural airflow from northern and north-westerly winds.

Can utilities for electricity and water be completely separated from the main building?

Yes. We run separate electrical and water lines from the main distribution board or a dedicated meter, and verify any new connections with municipal approvals.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works