Farm & rest-house construction in Kuwait - Funaitees

Farm & rest-house construction in Funaitees

Farm and rest house construction in Funaitees requires careful drainage planning in a zone with humid conditions and sandy soil. We oversee foundations, frame and boundaries from design through final handover under a single contract.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees is dominated by sandy soil and wet clay, and farm and rest house plots there need strong horizontal dampproofing in foundations to prevent ground moisture. Drainage pipes require carefully calculated slopes and may need lift stations if groundwater is near the surface. Building on sandy soil means foundations spread horizontally and are poured on compacted subgrade, and deep excavation may need side bracing.

Funaitees lies in Mubarak Al-Kabeer governorate near beaches and humid zones.

Funaitees sandy and humid soil requires foundation depth of at least 1.5 metres below natural ground level.

Back to Farm & rest-house construction

What the work covers - Farm & rest-house construction

What the work covers

Every trade from design to boundary wall under one contract for the full farm.

  • Rest-house design

    Floor plan, facade and drawings tailored to the farm plot

  • Farm boundary wall

    Reinforced block perimeter wall with proper strip footings

  • Rest-house shell

    Reinforced concrete frame and block walls ready for finishing

  • Full finishing

    Marble, tiling, gypsum, paint, aluminium windows and doors

  • Water and plumbing

    Overhead tanks, pump room, plumbing and drainage installation

  • Covered outdoor areas

    Shaded pergolas, paved courtyards and outdoor sitting spaces

How it works.

  1. Call or whatsApp

    Describe the plot size, location and what you want built

  2. Site visit

    Engineer visits the plot, notes soil conditions and access

  3. Design and quote

    Architectural drawings prepared alongside an itemised cost offer

  4. Permit and start

    Drawings submitted for permit; work starts after approval is issued

  5. Build and handover

    Construction follows approved drawings stage by stage to handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Farm & rest-house construction in Funaitees

Call now
Why is horizontal dampproofing important in Funaitees farm foundations?

Wet soil and near groundwater cause moisture in foundations and floor slabs, so we use bitumen and polyethylene layers to protect the building from rising dampness.

Do sewage pipes need lift stations in Funaitees?

If groundwater level is high, we install a small lift station to pump sewage toward municipality lines, subject to the engineer's approval.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works