Farm & rest-house construction in Kuwait - Anjafa

Farm & rest-house construction in Anjafa

Farms and rest houses in Anjafa rely on medium-sized plots with stable soil. We specialise in comprehensive design and execution with sturdy boundary walls and reliable utilities.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa is a residential district marked by fairly uniform plot sizes and good balance between built structure and green space. Most farms here are one to two storey buildings on a plot with front and rear gardens. The soil in Anjafa is relatively stable, reducing settlement risk after completion. Boundary walls must respect strict setbacks from the road and neighbours, and water, electrical and drainage networks are readily available from public property.

Anjafa is located in Hawalli governorate, a quiet residential area with well-balanced plot divisions.

The minimum setback from the main road in Anjafa is four metres per municipality zoning.

Back to Farm & rest-house construction

What the work covers - Farm & rest-house construction

What the work covers

Every trade from design to boundary wall under one contract for the full farm.

  • Rest-house design

    Floor plan, facade and drawings tailored to the farm plot

  • Farm boundary wall

    Reinforced block perimeter wall with proper strip footings

  • Rest-house shell

    Reinforced concrete frame and block walls ready for finishing

  • Full finishing

    Marble, tiling, gypsum, paint, aluminium windows and doors

  • Water and plumbing

    Overhead tanks, pump room, plumbing and drainage installation

  • Covered outdoor areas

    Shaded pergolas, paved courtyards and outdoor sitting spaces

How it works.

  1. Call or whatsApp

    Describe the plot size, location and what you want built

  2. Site visit

    Engineer visits the plot, notes soil conditions and access

  3. Design and quote

    Architectural drawings prepared alongside an itemised cost offer

  4. Permit and start

    Drawings submitted for permit; work starts after approval is issued

  5. Build and handover

    Construction follows approved drawings stage by stage to handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Farm & rest-house construction in Anjafa

Call now
What foundation type suits medium plots in Anjafa?

Strip or isolated footings with concrete columns suit most Anjafa farms because the soil is stable and building loads are moderate.

Do you follow up on municipality approvals for boundary wall drawings?

Yes, we submit boundary wall drawings to the municipality before starting construction and obtain approval on height, thickness and materials. We do not begin work without this clearance.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works