Construction on instalments in Kuwait - Dajeej

Construction on instalments in Dajeej

Construction on instalments in Dajeej targets buyers building a residential villa on desert land with regular payments. It spans from excavation and foundations to complete finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Dajeej is on Farwaniya's desert fringe, with relatively large plots and sparse current building, making it a choice for families seeking an independent villa at lower cost. The soil is sandy and requires deep excavation for foundations and good water drainage. The instalment model lets a family pay over nine or ten stages, with longer intervals between phases due to the villa's larger size and distance from the city centre.

Dajeej sits in Farwaniya governorate, a desert-fringe area with spacious plots and low building density.

Desert villas require excavation 1.5 to 2 metres deep for foundations, with a robust drainage system for groundwater.

Back to Construction on instalments

What we build on instalments - Construction on instalments

What we build on instalments

Villas, apartments and turnkey homes delivered across a structured milestone payment plan.

  • Villa build, instalment plan

    Full reinforced concrete villa built and paid at verified construction stages.

  • Apartment building, instalments

    Multi-unit residential building paid per completed floor or confirmed structural phase.

  • Turnkey build, instalments

    Complete build from foundation to full finishing paid across agreed project phases.

  • Shell structure, staged payment

    Grey frame completed and paid per floor slab or confirmed structural element.

  • Finishing works, instalments

    Marble, tiling, gypsum and electrical paid once each finishing phase is approved.

  • Scope and payment review

    Full scope reviewed and instalment schedule drafted before the contract is signed.

How it works.

  1. Call or whatsApp

    Describe your plot, intended build and preferred payment schedule.

  2. Site visit

    Team visits the plot, reviews drawings and current permit status.

  3. Sign contract

    Full scope, milestone list and instalment schedule agreed and signed.

  4. Build by milestone

    Each phase built, inspected and confirmed before next payment.

  5. Handover

    Final inspection, punch list resolved and project documents handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Construction on instalments in Dajeej

Call now
Do permit and engineering fees need to be paid upfront before instalment construction begins?

Yes, permit fees, engineering design and site supervision costs are paid upfront before excavation starts. Subsequent construction phases follow the instalment schedule.

Does sandy soil affect the price of construction on instalments?

Yes, sandy soil requires deeper excavation, additional foundation reinforcement and robust drainage, increasing foundation costs. This is reflected in the prices of the early phases.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works