Cement-board annex in Kuwait - Shuaiba

Cement-board annex in Shuaiba

A cement-board annex in Shuaiba provides extra rooms for homes and villas in the coastal industrial zone. We install frame and panels with materials resistant to salt and high moisture.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Shuaiba is a coastal industrial zone south of Ahmadi with homes and villas scattered among factories and industrial facilities on irregular plot sizes. Annexes here face combined challenges from salt, high humidity and industrial pollution, so we choose cement-board treated against corrosion and moisture, with strong exterior barriers of polyethylene or epoxy. We also install water drains at base and roof to manage water seepage.

Shuaiba lies in Ahmadi governorate in the industrial port zone and has a rapidly growing maritime industrial character.

Exposure to salt and moisture in Shuaiba requires inspection and repainting of exterior panels every two to three years to maintain integrity.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Shuaiba

Call now
How do you protect a cement-board annex from sea salt and high moisture?

We apply a strong exterior barrier of epoxy or polyethylene to all outer panels, with drainage pipes around the base and soffit vents under the roof to reduce interior moisture buildup.

Does a cement-board annex last long in Shuaiba's coastal industrial environment?

Yes, with routine maintenance every two to three years for paint and inspection, and the material itself lasts 20 years or more with proper sealing and protection from harsh conditions.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works