Cement-board annex in Kuwait - Sabah Al-Salem

Cement-board annex in Sabah Al-Salem

Cement-board annexes in Sabah Al-Salem provide a cost-effective, fast solution for adding extra rooms to detached villas and houses. We deliver the annex complete from frame to interior finish and core services without delay.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sabah Al-Salem is marked by well-spaced villas on relatively large plots, offering high flexibility in annex placement. Most houses here are one or two storeys only, so lightweight cement-board annexes integrate easily with the existing architecture. We focus on efficient service distribution between the annex and main building, ensuring no foundation or drainage conflicts.

Sabah Al-Salem sits in Mubarak Al-Kabeer governorate, near Sabah Al-Salem Park and well-planned residential neighbourhoods.

Plots in the suburb range from 600 to 1,200 square metres, allowing board annexes without crowding or setback violations.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Sabah Al-Salem

Call now
How long does a complete cement-board annex take from start to finish?

Usually 4 to 6 weeks depending on annex size and finish level. Initial site prep and footings take one week, then assembly and remaining finishes run 3 to 5 weeks.

Can power and water run from the main house to the annex without issues?

Yes. We route electrical, water and drainage lines from the main house panel through protected conduits underground or on exterior walls. We ensure lines do not cross footings.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works