Cement-board annex in Kuwait - Mansouriya

Cement-board annex in Mansouriya

Cement-board annexes in Mansouriya provide extra rooms for villas on standard plots following an approved plan. We install walls and roof from treated panels and seal everything with professional finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mansouriya is an organized residential district with villas on uniform plots near Fourth Ring Road. Villas follow similar layouts, and a cement-board annex is a fit solution for those wanting space without new foundations or structural rebuilding. We use moisture-resistant panels because the area sits near low-lying ground, and install side drainage around the annex. The light metal frame allows fast execution and avoids disrupting neighbouring villas during construction.

Mansouriya sits in the Capital governorate, an organized district of standard villas near Fourth Ring Road.

Mansouriya annexes usually require a separate building permit from the municipality even if the plot allows the total built area.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Mansouriya

Call now
Can cement-board withstand water seepage from low-lying ground?

Standard panels alone do not resist moisture. We use treated panels, install a moisture barrier at the base, and run side drainage to prevent water ingress.

How long does it typically take from permit to construction completion?

After receiving the permit, cement-board construction typically takes 6 to 8 weeks to final finishing, depending on annex size and required utilities.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works