
Cement-board annex in Mansouriya
Cement-board annexes in Mansouriya provide extra rooms for villas on standard plots following an approved plan. We install walls and roof from treated panels and seal everything with professional finishing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Mansouriya is an organized residential district with villas on uniform plots near Fourth Ring Road. Villas follow similar layouts, and a cement-board annex is a fit solution for those wanting space without new foundations or structural rebuilding. We use moisture-resistant panels because the area sits near low-lying ground, and install side drainage around the annex. The light metal frame allows fast execution and avoids disrupting neighbouring villas during construction.
Mansouriya sits in the Capital governorate, an organized district of standard villas near Fourth Ring Road.
Mansouriya annexes usually require a separate building permit from the municipality even if the plot allows the total built area.

What the annex covers
Cement-board rooms handled from frame and panels through to finished interior

Cement-board rooms
Enclosed rooms clad in cement-board panels on a cold-steel frame

Cold-steel framing
Galvanised steel sections forming the load-bearing skeleton for panels

Thermal insulation
Insulation layer inside the wall cavity to reduce interior heat gain

Joint and edge sealing
Sealant applied to all panel joints to block moisture entry

Interior finishing
Tiling or interior paint applied to suit the room's intended use

Electrical and AC works
Conduit runs and AC sleeves installed before panels are closed up
How it works.
First contact
Call or WhatsApp to describe the required room and its location
Site visit and measurement
We visit to measure the space and inspect the carrying slab
Quotation and sign-off
A detailed quote covering materials and finish is submitted then signed
Construction
Steel frame, panels, insulation, electrical and interior finish in sequence
Handover and check
Joints and finish are checked before handing the room over for use
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Cement-board annex
Other services in Mansouriya
Questions about Cement-board annex in Mansouriya
Call nowCan cement-board withstand water seepage from low-lying ground?
Standard panels alone do not resist moisture. We use treated panels, install a moisture barrier at the base, and run side drainage to prevent water ingress.
How long does it typically take from permit to construction completion?
After receiving the permit, cement-board construction typically takes 6 to 8 weeks to final finishing, depending on annex size and required utilities.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps