Cement-board annex in Kuwait - Abu Fatira

Cement-board annex in Abu Fatira

Cement-board annexes in Abu Fatira serve villas and large plots needing extra rooms quickly without major demolition. We build the frame, install panels, and finish interiors completely on site.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abu Fatira plots are relatively large with generous ground space around older and mid-age villas, allowing side or rear annexes to be added easily. A cement-board annex needs level ground and proper side drainage to prevent moisture seepage under the light panels. We erect the steel frame, install panels with insulation gap and ventilation, then apply interior cladding, paint and flooring to the owner's specification.

Abu Fatira is in Mubarak Al-Kabeer governorate, a villa neighbourhood with large plots that allow external annexes.

The ground must be levelled with gentle slope to drain rainwater away from the annex walls.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Abu Fatira

Call now
Can a cement-board annex be built beside an old villa without breaking concrete?

Yes, the annex is fully independent and needs no structural connection to the existing villa. We choose a safe ground location, build the foundation and frame separately, then install panels and finishes.

How long does a 50-square-metre cement-board annex typically take to complete?

It depends on the season and interior specs, but the typical sequence is ground prep, foundation, frame, panels and finishing over consecutive weeks.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works