Block boundary wall in Kuwait - Funaitees

Block boundary wall in Funaitees

A solid boundary wall in Funaitees secures and clearly defines emerging residential plots toward roads and neighbours. We build the foundation and walls to approved municipality setbacks from initial levelling through final render.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees plots are medium-sized on mixed sand-clay ground with a shallow water table. Boundary walls need footings that account for possible soil settlement, especially near previously developed areas. The blocks and render resist seasonal moisture and salt deposits from groundwater, and the wall must stay plumb despite soil movement from weathering.

Funaitees sits in Mubarak Al-Kabeer governorate, a zone of emerging residential plots near Mubarak Al-Kabeer city.

The water table in Funaitees ranges from one to one and a half metres, so drainage around the footing is needed to prevent rising damp.

Back to Block boundary wall

See also: Block walls in Funaitees

What the work covers - Block boundary wall

What the work covers

Full execution of the perimeter boundary wall from layout marking to finished render.

  • Boundary layout

    Mark the plot boundary accurately before any excavation begins.

  • Footing excavation and pour

    Excavate and pour the strip footing at depth suited to local soil.

  • Foundation waterproofing

    Apply a damp-proof course to block salt and moisture rise into blockwork.

  • Block laying

    Lay block courses plumb and level with bed-joint mesh reinforcement.

  • Reinforced columns and ties

    Cast reinforced concrete columns along the wall to resist lateral loads.

  • Render and finish

    Render both faces smooth and ready for paint or stone cladding.

How it works.

  1. First contact

    Call or WhatsApp us to describe your plot and arrange a site visit.

  2. Site survey

    We visit to measure the perimeter, assess soil and set the footing depth.

  3. Quotation

    A detailed quote is submitted covering quantities, materials and method.

  4. Construction

    Footing pour, block laying, column casting and render in sequence.

  5. Handover

    We inspect plumb, level and finish with you before final sign-off.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Block boundary wall in Funaitees

Call now
Does the wall suffer from groundwater and seasonal moisture?

Yes, which is why we use blocks with tight pores and moisture-resistant render. We add horizontal drainage around the footing to divert rising water and protect the base from saturation.

How do you keep the wall plumb on ground that may settle or shift over time?

We build a strong footing at sufficient depth resting on stable soil layers. We monitor the build horizontally and vertically with laser tools, and space expansion joints in the render to absorb natural ground movement.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works