Architectural design & drawings in Kuwait - Salam

Architectural design & drawings in Salam

Approved drawings in Salam cover complete boundary survey, architectural and structural design and all utilities. We deliver municipality-signed and approved plans ready for construction.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salam is a relatively modern residential area with new villas on uniform plot sizes, some small apartment buildings. Designs benefit here from better-organized service networks than older zones. We draw plans accounting for central distribution points for water, electrical and drainage networks. We also base foundations on local soil test reports, as soil layers in Salam are variable.

Salam is in Hawalli governorate, a modern residential zone with uniform plots near the co-operative.

We recommend soil testing before drawing foundations as Salam soil may contain alternating sand and clay layers.

Back to Architectural design & drawings

What the drawings cover - Architectural design & drawings

What the drawings cover

Every set from boundary survey through structural layout to approved electrical plan

  • Plans by plot size

    Layouts drawn to your exact plot dimensions and municipality setback rules

  • Single-storey villa plans

    Full architectural set for one-level houses including room layout and facades

  • Two-storey villa plans

    Upper and lower floor layouts with stair positioning and structural coordination

  • Electrical layout drawings

    Circuit diagrams showing panel positions, outlet runs and lighting points

  • Plot sketch (kroki)

    Boundary sketch confirming plot shape, corners and access points before design

  • Land surveying

    On-site measurement of levels and boundaries for an accurate drawing base

How it works.

  1. Call us

    WhatsApp or phone to share your plot number and goals

  2. Site visit

    Engineer visits the plot to measure and record boundary details

  3. Draft review

    You receive the draft floor plans and request any changes

  4. Final drawings

    Corrected set is prepared with engineering stamp and signatures

  5. Permit submission

    Complete drawing package is ready for municipality permit application

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Architectural design & drawings in Salam

Call now
Can we draw plans without prior soil testing?

We can draw initial and structural plans based on design, but final foundations require a soil test report to ensure safety and code compliance.

What is the timeline from drawing completion to building permit issuance?

Complete drawings take two weeks, and municipal submission may add two more weeks depending on workload. The municipality may request minor revisions, typically resolved within a week.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works