Annex construction in Kuwait - Salmiya

Annex construction in Salmiya

Villa annexes in Salmiya are added on plots near Gulf Road, often to newer buildings with deep foundations and engineered columns. The annex is designed to the same standards and securely tied to the main structure through detailed soil investigation.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salmiya plots are smaller than Hawalli, ranging from 400 to 600 square metres, mostly built in the last two decades with modern methods. Annex work here requires careful investigation of the original foundation depth and soil type to prevent differential settlement, especially for tall annexes built right against the villa wall. We use piles or deep footings for the annex if needed, and run soil load tests before the first pour.

Salmiya is in Hawalli governorate, a district of recently built villas on regular plots near Marina Mall.

Foundations in Salmiya typically reach depths of 3 to 4 metres because of moisture-prone soil close to the seafront.

Back to Annex construction

What we build for you - Annex construction

What we build for you

From a single room addition to a full two-storey annex, designed and permitted.

  • Annex design

    Architectural and structural drawings prepared for municipality permit submission.

  • Outdoor annex construction

    Ground-level reinforced concrete annex with its own independent foundation.

  • Two-storey annex

    Two-floor addition with a foundation sized for the full combined load.

  • Annex renovation

    Demolish, replan, and rebuild an existing annex to a new layout.

  • Structural tie-in

    Epoxy dowels and bonding agents tying new concrete to the existing frame.

  • Annex finishing

    Block walls, plaster, tiling, and aluminium works to match the main villa.

How it works.

  1. Call or whatsApp

    Share photos and the plot; a site visit is arranged.

  2. Site assessment

    Structural check of the existing villa and plot boundary review.

  3. Design and permit

    Drawings prepared and submitted to the municipality for approval.

  4. Construction

    Foundation, frame, tie-in work, block walls, slab, and finishing.

  5. Handover

    Snagging completed, keys and approved drawings handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Annex construction in Salmiya

Call now
Should the annex have separate foundations or be tied to the main villa's foundation?

It is best to separate foundations unless the geotechnical profile is identical. We test soil to 4 metres depth; if properties match we tie them with engineered concrete connector, if they differ we excavate to equal depth for each.

Can a two-storey annex be built against the villa in Salmiya?

Yes, but it requires municipality approval and verification that the original foundations can carry the added load. We conduct full structural calculations and submit a soil-bearing report with the permit application.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works