Annex construction in Kuwait - Khitan Al-Jadida

Annex construction in Khitan Al-Jadida

Annex construction in Khitan Al-Jadida adds rooms or residential units to your villa with separate foundations and safe concrete bonding. We handle design, approvals, and full technical supervision.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Khitan Al-Jadida villas are built on medium to large plots, from 700 to 1300 square metres, mostly on piled foundations due to clay soil. An added annex needs separate and deep foundations, with strong bonding via reinforcing bars embedded in the existing villa body. The area's newer environment means most villas were built recently, which simplifies documentation and precise bonding.

Khitan Al-Jadida is in Farwaniya governorate, a district of relatively newer villas near other residential areas.

Annexes in Khitan Al-Jadida share the original villa piles via documented reinforcing bar connections during concrete pouring.

Back to Annex construction

What we build for you - Annex construction

What we build for you

From a single room addition to a full two-storey annex, designed and permitted.

  • Annex design

    Architectural and structural drawings prepared for municipality permit submission.

  • Outdoor annex construction

    Ground-level reinforced concrete annex with its own independent foundation.

  • Two-storey annex

    Two-floor addition with a foundation sized for the full combined load.

  • Annex renovation

    Demolish, replan, and rebuild an existing annex to a new layout.

  • Structural tie-in

    Epoxy dowels and bonding agents tying new concrete to the existing frame.

  • Annex finishing

    Block walls, plaster, tiling, and aluminium works to match the main villa.

How it works.

  1. Call or whatsApp

    Share photos and the plot; a site visit is arranged.

  2. Site assessment

    Structural check of the existing villa and plot boundary review.

  3. Design and permit

    Drawings prepared and submitted to the municipality for approval.

  4. Construction

    Foundation, frame, tie-in work, block walls, slab, and finishing.

  5. Handover

    Snagging completed, keys and approved drawings handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Annex construction in Khitan Al-Jadida

Call now
Must the annex and villa share the same foundations?

No, but they must be structurally connected. We use separate annex foundations with penetrating reinforcing bars to link both frames firmly and safely.

How long does building a one-storey annex take in Khitan Al-Jadida?

It depends on annex size and building season. Usually two to three months from excavation to delivering the concrete frame ready for finishing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works