Adding a floor to homes in West Abdullah Mubarak means assessing whether existing foundations and columns can carry the extra load safely. We evaluate the current structure, calculate loadings, then pour and finish the new level with continuous site engineer oversight.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most homes in West Abdullah Mubarak are 2 to 3-storey residential buildings on plots of around 500 square metres, built 10 to 20 years ago. When adding a floor, we pull the original drawings from the municipality or previous contractor and inspect foundation depth, column diameter and existing reinforcement. Many of these homes were designed with load margin for one extra storey if foundations are deep enough, but some plots need column reinforcement or new beams. We handle the entire job from assessment through handover.
West Abdullah Mubarak lies in Farwaniya governorate, a relatively established residential neighbourhood of medium-sized family homes.
Most plots in the area range from 400 to 600 square metres, and existing foundations typically run 1.5 to 2 metres deep to support current columns.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in West Abdullah Mubarak
Questions about Additional floor in West Abdullah Mubarak
Call nowHow do you determine if my home can carry an extra floor?
We examine the original drawings and take soil samples, then calculate current and additional loads. If foundations are deep and columns thick enough, the home can carry it. If not, we upgrade the columns or add reinforcing beams.
Do I need to strengthen the foundations for an additional floor?
Not always. If foundations are deep, soil is good and columns are thick enough, no reinforcement is needed. But if foundations are shallow or soil is weak, we add underpinning or widen the base.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps