Additional floor in Kuwait - Omariya

Additional floor in Omariya

Reinforcing a house structure to carry an additional floor in Omariya begins with a thorough survey of existing foundations and columns. We determine whether reinforcement is minimal or requires deeper structural intervention before submitting the permit application.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Houses in Omariya sit on relatively large plots and were mostly built decades ago with simple specifications, not designed for future additional floors. When surveying such structures, we often find shallow concrete foundations and columns that cannot carry substantial extra loads. We may need to dig additional support piers beneath the existing foundations or strengthen columns by adding shear walls. The new floor will follow the same setback plan but must not exceed the neighbourhood's height ceiling.

Omariya sits in Farwaniya governorate, a family residential district under the Omariya Housing Co-operative.

Older house foundations in Omariya are typically shallow concrete requiring detailed investigation before any floor addition is approved.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Omariya

Call now
Can an older Omariya house get an additional floor without major reinforcement?

It depends on the actual condition of the foundations and columns. Some houses need only localized column reinforcement, others require new support piers. We assess each case through detailed structural evaluation.

How long does the structural assessment take before applying to the municipality?

On-site inspection takes several days, and laboratory testing of samples takes one to two weeks. We then prepare the detailed report and drawings for the municipal application.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works