Additional floor in Kuwait - Jaber Al-Ali

Additional floor in Jaber Al-Ali

Assessing additional-floor feasibility in Jaber Al-Ali requires careful study of foundation and existing frame strength. We conduct structural and geotechnical tests, then build the new storey safely and efficiently.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Jaber Al-Ali comprises one- and two-storey family homes on plots of 600 to 900 square metres, with a mix of newer and older buildings. Older homes may need foundation reinforcement or load recalculation before adding any new floor, especially if built on weak sandy soil. We run bearing and settlement tests to confirm foundation stability under added load.

Jaber Al-Ali is in Ahmadi governorate, a planned family residential district with regular plots and wide streets.

We measure existing column and beam dimensions and input the data into structural load calculations before approving the new floor.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Jaber Al-Ali

Call now
Does the sandy soil in Jaber Al-Ali support a strong foundation for an extra storey?

Sandy soil requires precise bearing tests. We conduct test bore holes and soil sampling to determine bearing capacity and expected settlement before design.

Does the current foundation need reinforcement before building?

Yes, if tests show the foundation cannot handle extra load. We use pressure grouting or add new foundations parallel to existing ones.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works